SITE SEARCH:
English version > Projects > Company projects > Technex Limited won the tender of air separation plant supply for steel mill Metal Industries (MI)

Company projects

Technex Limited won the tender of air separation plant supply for steel mill Metal Industries (MI)

02-11-2008

Technex will supply the 4500Nm3/h Air Separation Plant
Outputs,purity, pressure:
GO2=4500 Nm3/h; 99.5%O2; 16 bar G min
LO2= 250 Nm3/h; 99.5%O2;
GN2=400 Nm3/h; 99.999%N2 10PPmO2;16 bar G min
LN2=50 Nm3/h; 99.999%N2 10PPmO2
LAr=140 Nm3/h; 99.999%Ar(PPmO2, PPmN2), 21 bar G min
Note:

1. Nm3/h refers to the volume flow at 0C& 101.3KPa. (the same in the following)
2. Operation period (duration between two major heating): 2 years
3. Warming and de-riming Time: 36 h4. Starting Time: 36 h

 


All rights reserved. © 2005 - 2024 Technex